Skip to content
Sky Rising News
Partnerships & Media
In depth

Application Testing on

What a North Carolina road agency learned from a tethered-drone pilot

Aerial UAS structural inspection perspective of a steel truss highway bridge.
Aerial UAS structural inspection perspective of a steel truss highway bridge.Credit: Oregon Department of Transportation / Wikimedia Commons · commons.wikimedia.org ↗ · creativecommons.org ↗ · CC BY 2.0 · Fine halftone added by Sky Rising News.. Rights: CC BY 2.0 (creativecommons.org ↗) (commons.wikimedia.org ↗).

A road incident can leave traffic managers without a useful camera view just when queues are changing quickly. In a 2022–23 pilot, North Carolina Department of Transportation (NCDOT) tested two tethered aircraft arrangements for incident and queue awareness. Its 2023 final report describes both practical uses and the difficulties of getting equipment, people and video links ready. It is a record of a limited pilot, not a universal product ranking. [E1]

Contents
  1. What was tested
  2. The video path mattered as much as the aircraft
  3. Two reported uses, two different results
  4. Pilot, research and policy are separate

What was tested

NCDOT's Traffic Systems Operations and Division of Aviation acquired an integrated Fotokite system and a DJI Mavic 2 paired with a V-Line tether. The report calls the second combination the Mavic2 System. The Fotokite integrated the aircraft, tether and ground station; the Mavic 2 arrangement involved separate components assembled for use. The report does not establish the exact Fotokite model or all configuration details. Nothing in these tests establishes the performance of a DJI M350. [E1, pp. 6–7, 12]

Incident Management Assistance Patrol (IMAP) supervisors tested the systems across several regions, with varied geography and cellular coverage. Eleven supervisors were trained on both technologies. Distribution tables show training in January 2022 and regional assessment periods into January 2023; assignment to a region does not mean a drone flew throughout that period. The Mavic 2 arrangement was returned for correction after a camera-calibration problem, followed by additional training in March. [E1, pp. 7–9]

The video path mattered as much as the aircraft

The pilot's Fotokite workflow used its application and an event code or QR code to share a stream. The Mavic 2 workflow used an iPad and a Microsoft Teams screen share. NCDOT reports that the Fotokite feed required firewall troubleshooting; the Mavic 2 workflow involved multiple cases, assembly and additional software. Some locations had insufficient cellular service for streaming. These are observations about the pilot's specific arrangements, not proof that every deployment of either product behaves the same way. [E1, pp. 7, 11–13, 15]

The final report says users gave the Fotokite slightly higher evaluation scores overall because it was an integrated unit, while both received similar scores in most areas. It recommended considering additional tethered systems and expressed a preference for Fotokite in light of the Mavic 2 setup's weather limitations. A recommendation in the 2023 report is not evidence of a subsequent purchase or continuing operational programme. [E1, pp. 15, 26]

Two reported uses, two different results

NCDOT describes an incident on I-95 near Dunn in which a vehicle struck a bridge. The report says the Fotokite stream helped the Statewide Transportation Operations Center observe traffic and adjust signal timing and emergency traffic control as traffic was diverted. It does not quantify clearance-time savings or establish causation from a controlled comparison. [E1, p. 13]

The report also describes the Mavic 2 arrangement at a planned four-day sporting event. The team did not use it on days two and three after difficulties on the first day, including poor cellular service, a battery pack lasting about two hours per charge and cumbersome transport and assembly. That is a field observation for this event, not a general endurance rating. [E1, p. 13]

Pilot, research and policy are separate

A January 2025 research report prepared for Utah DOT interviewed transport agencies and summarised North Carolina's experience. It reports operator preferences and staffing challenges, but is a research account based on interviews and other material, not an independent recreation of the North Carolina tests. It does not establish that Utah operated the same two aircraft. The report explicitly says its authors' conclusions do not necessarily represent Utah DOT policy. [E2, pp. ii, 34–37]

The North Carolina report's checklists and procedural notes document that 2022–23 pilot rather than serving as a standing clearance for other agencies [E1, pp. 26–33]. Separately, a May 2025 California DOT (Caltrans) research note on five Fotokite systems shared with Washington State DOT reported that all five units required factory repair during evaluation—covering a motor-controller crash, battery overheating landings, rain-induced lens condensation, and a Remote ID firmware connectivity drop—while teams tested external cellular modems, Starlink, and private-APN SIMs to address weak field reception [E3].

For highway agencies weighing tethered UAS for incident management, the documented pilots point to three operational checks before deployment: whether video feeds traverse agency firewalls reliably, whether cellular or satellite backhaul holds up in rural corridors, and whether responders can launch and recover the system alongside active traffic duties.

Sources

  • [E1]
    NCDOT Traffic Systems Operations — Safety Service Patrol Technology Pilot Project Final Report (24 July 2023)connect.ncdot.govsource
  • [E2]
    Utah DOT / BYU — Using Unmanned Aerial Systems to Facilitate Traffic Incident Management (UT-24.20, Jan 2025)rosap.ntl.bts.govsource
  • [E3]
    Caltrans — Task 4289 Fotokite Research Note (May 2025)dot.ca.govsource

Related resources